banner

Previous Slide
Next Slide
work areas

Workers Areas

New door frames were added before walls were constructed around them. Lights were installed and walls were painted giving the areas a finishing touch.

Mezzanine

The Mezzanine floor was poured before vents and PVC were installed throughout the second floor.

Previous Slide
Next Slide
Mezz
Previous Slide
Next Slide
bricks

Red Brick Wall

Bricklayers set courses of brick on the outside of the kitchen walls.

Kitchen

Lights were installed in the ceiling at the beginning of the week. Drains were set in the floor. The floors were cleaned before work began to coat the floor of the work areas.

Previous Slide
Next Slide
kitchen