banner

Previous Slide
Next Slide
openings

Demolition Days

A final walk around the area before the demolition crew take down the walls from the East side of the school

Wood Shop

The woodshop was the first room to go. The roof proved a challenge. It took a little more effort for the beams to be torn out.

Previous Slide
Next Slide
demo
Previous Slide
Next Slide
demo 2
Previous Slide
Next Slide
woodshop
Previous Slide
Next Slide
multi

End of an Era

By the end of the week, the area looked bare with all the rooms removed from the school.