Week of 7/31 - 8/4
Slider is playing
Sidewalks
The Sidewalks around the South wing were framed and poured over the week. The area around the East side was cleaned up and finished.
Longer Hallway
The East wing was quickly tying into the existing building. Wires ran through a much longer hallway to reach past the Multi and into the Mezzanine. On the West side of the Multiroom wall, trophy cases were installed to house all of the bling Panthers earned and will be awarded.
Slider is playing
Slider is playing
Floor Time
Crews came in, cleaned the floor of the Multiroom, then layed the new flooring. Looking closer to game time!
The Ceiling of the Theater was finished in preparation for showtime.