banner

building

Slider is playing
bricks

Bricks

Bricks were raised on the outside of the South Wing of the School, going from yellow foam to red brick.

Metal

Sheets of metal started to cover the second level of the East side over the week.

Slider is playing
metal
Slider is playing
wires

Wires

Wires were run from the South wing to the Mezzanine. Lights were connected in the theater.

More Room

The rooms took on more of a classroom feel as they gained ceilings. Wires started to drape through the hallway and rooms for power.

Slider is playing
rooms