Week of 6/5 - 6/9
Slider is playing
Walls
As bricks were stacked, the overhang of the existing roof was removed to prepare for the South wing addition. The South wall was completed before the week was over.
Band Storage
The instrument lockers were completed to give the band a lot of space to keep organized. Water fountains were installed in the multi and Industrial Arts hallway. Work continued in the Mezzanine to power and heat the new additions.
Slider is playing
Slider is playing
Wrapping it up
Crews continued to board up the second level and wrapped it up while weather was in their favor.
Lunch Negotiations
Patrick worked hard to broker a deal with the 11th grade Econ class to have lunch this week. Negotiations were long and rough before he walked away with a meal.