As bricks were stacked, the overhang of the existing roof was removed to prepare for the South wing addition. The South wall was completed before the week was over.

Band Storage

The instrument lockers were completed to give the band a lot of space to keep organized. Water fountains were installed in the multi and Industrial Arts hallway. Work continued in the Mezzanine to power and heat the new additions.

Previous Slide
Next Slide
lockers
Previous Slide
Next Slide
2n level

Wrapping it up

Crews continued to board up the second level and wrapped it up while weather was in their favor.

Lunch Negotiations

Patrick worked hard to broker a deal with the 11th grade Econ class to have lunch this week. Negotiations were long and rough before he walked away with a meal.