Second Level

Insulation was sprayed on the Exterior walls of the second level before covered with plywood.

Mezzanine

Pipes, Wire, and Ductwork continue be installed troughout the week.

Previous Slide
Next Slide
Mezz
Previous Slide
Next Slide
floor

Floor Pour

Crews arrived very early on Wednesday to pour the floor of the South wing in a day. They kept it cool with water to give it time to set for the week in the hot temperatures.

Multi and Theater

The multi gained a Panther stripe while the Theater got the final coat of white this week. Storage was moved in for instruments and supplies. Crews worked on wiring the backboards as well.