Week of 5/29 - 6/2
Slider is playing
Second Level
Insulation was sprayed on the Exterior walls of the second level before covered with plywood.
Mezzanine
Pipes, Wire, and Ductwork continue be installed troughout the week.
Slider is playing
Slider is playing
Floor Pour
Crews arrived very early on Wednesday to pour the floor of the South wing in a day. They kept it cool with water to give it time to set for the week in the hot temperatures.
Multi and Theater
The multi gained a Panther stripe while the Theater got the final coat of white this week. Storage was moved in for instruments and supplies. Crews worked on wiring the backboards as well.
Slider is playing