
Week of 7/4 - 7/8
Slider is playing

Insulate
Foam Insulation was added around the foundation before the area was backfilled.
Top to Bottom
As work on the footings continue, a new roof is in the works for the South wing fo the school. More foundation is formed and poured on the East side.
Slider is playing
