Week of 8/1 - 8/5
Slider is playing

East Wing
The Elementary Wing is longer now with the 2 new classrooms . The crews are finishing the inside of the room with the celing and electrical for lights.
East Side
A travel around the East Side shows the outlines of the New Woodshop and Multiroom. The kitchen area is masked by scaffolding and existig walls. Crews work on the foundation, electric, plumbing, and gas lines.
Slider is playing

Slider is playing

Woodshop Hallway
A walk down the hallway to the future woodshop. The temperary wall is removed and the view is very different on the outside.