Week of 8/29 - 9/2
Slider is playing
Above the Tiles
Many, many miles of wire and cable was instulled above the ceiling tiles since before summer vacation started. New lights, intercom, and alarm system were installed throughout the school. The new elementary classrooms were added to the electric circuit.
Sidewalks and Multipurpose Room
Sidewalks along the school meet in the middle at the gym. The walls get taller on the East side for the Multiroom.
Slider is playing
Slider is playing
Elementary Rooms
The elementary class rooms are nearly finished, with flooring and cabinets installed. Waiting for a final inspecting before the ceiling tiles are put in place and furniture can move in.
High School Science Lab
Cabinets are quickly installed and plumbing ready for countertops.