banner

Slider is playing
paving

Paving

Forms were set at the beginning of the week, then ramps were poured for the Kitchen and Industrial Arts entrances. Crews prepared fo the steps into the Theater area to be poured.

South Side

The south side footings were raised before crews started place foam around the sub-walls.

Slider is playing
South Wing
Slider is playing
inside

Inside Jobs

Work continues on the inside with venting, wires and a full paint job in the multiroom.