Muddy Job

The rain and mud did not stop crews from forming the footings through the week. By the end of the week, things dried up enough to pour the first level of the footings.

Second Level

Framing went up around the second level of the East Addition. The construction supplies were cleared out and the ground was leveled east of the school.

Previous Slide
Next Slide
outside
Previous Slide
Next Slide
wires

Wires & Pipes

More and More wire were run through the East Addition to collect in the Mezzanine. More drywall was installed in the heater room.

The ventilation system was also assembled in the Industrial Arts area, making it look like a sci-fi spider lurking overhead.