Kitchen Spaces Divided

Crews didn't wait for the final exterior wall to dry before preparing to build the interior walls. The ceiling became a maze of wires, pipes and vents.

Office Space

The most important space in the Kitchen (according to the Head Cook) was framed in over the week. Mrs. Barber was so excited to get a sneak peak at her new office space and the quickly changing kitchen area.

Previous Slide
Next Slide
office
Previous Slide
Next Slide
beams

Roof Support

Once the beams were dug out of the snow, crews quickly placed them to create a gridded sky view.

At the End of the Week

The Multipurpose Room was lit by yellow lights in the early morning were crews prepare for the days. The theather was quiet for now. The South storage room was wired in and ready to link to the other rooms. The kitchen area was with walls and an office space. The Wash Area and Storage Room were prepped with stacks of bricks and a doorway.

Out side, The mortar was mixed with warm water and moved quickly into the heated kitchen space. The crews disturbed slumbering mice to dig roof supports out of the snow.